Recommendations / Transportation / Big Idea #2: Connectivity - Tangible

Big Idea #2: Connectivity - Tangible

Part of the "ACDC - Arts & Culture Douglas County" initiative

TransportationDouglasville/Douglas$500,000–$1,000,000

Overview

Create a physical link from the Creativity Corridor downtown to surrounding areas of Douglas County through bike paths, history markers, signage, sidewalks, landscaping, and artwork installations throughout the county. The report recommends a master plan for bike paths and bike lanes throughout Douglasville and Douglas County connecting parks, hotels, and key destinations; a bike share program sponsored by local businesses; increased sidewalks, landscape beautification, and LED street lighting; landscaping along major roads and interstate exits; decorative or historical mile markers; and long-term connections from Downtown Douglasville to the Chattahoochee River Corridor and Silver Comet Trail.

Action plan

Short-term
Promote the availability of free WiFi downtown in public domain.
Medium-term
Install story boards in strategic locations downtown, including between SR78 and railroad ROW; upgrade signage throughout the community to provide directions to primary cultural assets; convert pedestrian and street lighting to LED.
Long-term
Adopt a bike share program sponsored by local businesses; establish a greenbelt/PATH connecting all natural resources in the community; create key connections on SR92 at Silver Comet Trailhead and Chattahoochee Hills Regional Path system; partner with GDOT and local landscape experts to beautify I-20 exits; determine whether a multi-use trail can be created adjacent to SR92 connecting Downtown to Silver Comet Trail.

Expected impact

Buffered Bike Lane CostOperational

Tracks cost option for buffered bike lanes at existing roads.

Projected: $150,000 Dollars per mile
Public Transportation ConsideredInfrastructure

Tracks consideration of public transportation to further link the community.

SR92 Key ConnectionsInfrastructure

Tracks key connections on SR92 at the Silver Comet Trailhead and Chattahoochee Hills Regional Path system.

Timeframe: Medium-term
Historical Interpretive Display Per-Sign Cost RangeOperational

Tracks the per-sign cost range used for historical interpretive displays.

Projected: $2,000-$4,000 Dollars per sign
One Douglasville/Douglas County VisionInstitutional

Tracks building the arts/culture community from the common vision of creating “one” Douglasville/Douglas County.

Historical Interpretive Display CostOperational

Tracks cost to develop/install historical interpretive displays in strategic locations.

Projected: $95,000 Dollars · Timeframe: Long-term
Better Quality of Life Through Outdoor ActivitiesCommunity

Tracks expected access to a better quality of life through an abundance of outdoor activities.

Chattahoochee River Corridor Connection DistanceInfrastructure

Tracks the distance named for connecting Downtown Douglasville to the Chattahoochee River Corridor hike/bike trails.

Projected: 8.75 Miles · Timeframe: Medium-term
Pedestrian and Street Lighting Converted to LEDInfrastructure

Tracks conversion of pedestrian and street lighting to LED.

Timeframe: Long-term
Bike Share Program AdoptedInfrastructure

Tracks adoption of a bike share program sponsored by local businesses.

Timeframe: Long-term
Parks, Hotels, and Key Destinations ConnectedInfrastructure

Tracks whether the connectivity plan connects parks, hotels, and key destinations throughout the area.

Community Signage UpgradedInfrastructure

Tracks upgraded signage throughout the community to provide directions to primary cultural assets.

Timeframe: Long-term
Personal Growth and Civic PrideCommunity

Tracks expected personal growth and civic pride created through connectivity and exposure to arts/culture.

Sidewalk IncreasesInfrastructure

Tracks consideration of increasing sidewalks in the existing right of ways on city and county streets.

Story Boards Installed DowntownInfrastructure

Tracks installation of story boards in strategic downtown locations.

Timeframe: Long-term
Decorative or Historical Mile MarkersInfrastructure

Tracks strategic placement of decorative or historical mile markers relevant to Douglas County.

Timeframe: Medium-term
Wayfinding Sign Design Palette CostOperational

Tracks cost for the design palette of signs for wayfinding.

Projected: $30,000 Dollars · Timeframe: Long-term
SR92 Future Expansion CostOperational

Tracks future expansion cost adjacent to SR92 connecting downtown to Silver Comet Trail.

Projected: $150,000 Dollars per mile
Landscaping and Signage Design Palette CostOperational

Tracks cost for the design palette of landscaping and signage.

Projected: $25,000 Dollars
Dedicated Multi-Use Path CostOperational

Tracks cost option for a dedicated multi-use bike/pedestrian path, 12 feet wide.

Projected: $600,000 Dollars per mile
Medium-Term Connectivity BudgetOperational

Tracks the total medium-term budget for signage and historical interpretive displays.

Projected: $300,000 Dollars · Timeframe: Medium-term
Local Business Bike SponsorshipsInfrastructure

Tracks local business sponsorship of bikes for logo bike wraps.

Physical Link to Surrounding CountyInfrastructure

Tracks creation of a physical link from the Creativity Corridor downtown to surrounding areas of Douglas County.

Interstate Exit Landscaping and Signage Installation CostOperational

Tracks installation cost for landscaping and signage at interstate exits.

Projected: $250,000 Dollars per interstate exit
Bike Parking CostOperational

Tracks cost for bike parking.

Projected: $500 Dollars per rack
Energy and Environment for New IdeasCommunity

Tracks expected creation of energy and an environment that fosters new ideas demanded by Millennials and Generation X.

Bike Share Program ProposedInfrastructure

Tracks creation of a bike share program to increase foot traffic to key destinations.

Better Community EngagementCommunity

Tracks expected better engagement for all throughout the community.

Silver Comet Trail Connection DistanceSustainability

Tracks the distance named for connecting Downtown Douglasville to the Silver Comet Trail.

Projected: 9.5 Miles · Timeframe: Medium-term
I-20 Exit BeautificationInstitutional

Tracks partnership with GDOT and local landscape experts to beautify I-20 exits.

Timeframe: Medium-term
New Connection to the County Through ArtCommunity

Tracks whether current residents and visitors who are not exposed to art gain a newfound connection to the county.

LED Street LightingInfrastructure

Tracks LED street lighting along existing rights of way.

Timeframe: Long-term
Greenbelt/PATH EstablishedInfrastructure

Tracks establishment of a greenbelt/PATH connecting all natural resources in the community.

Timeframe: Medium-term
Vehicular Intersection Enhancement CostOperational

Tracks cost for enhancement of vehicular intersections.

Projected: $3,000 Dollars per intersection
Enhanced Roadway Shoulder Biking Lane CostOperational

Tracks cost option to enhance roadway shoulders to include a 5-foot biking lane.

Projected: $100,000 Dollars per mile
Signage Installation at Points of Interest CostOperational

Tracks cost to develop and install signage at major geographical points of interest.

Projected: $175,000 Dollars · Timeframe: Long-term
Better Access to Arts and CultureEquity

Tracks expected better access to arts and culture for all residents and visitors in the county.

SR92 Multi-Use Trail FeasibilityInfrastructure

Tracks determination of whether a multi-use trail can be created adjacent to SR92 connecting Downtown to Silver Comet Trail.

Timeframe: Medium-term
Bike Path and Bike Lane Master PlanInfrastructure

Tracks development of a master plan for bike paths and bike lanes throughout Douglasville and Douglas County.

Landscape BeautificationInfrastructure

Tracks landscape beautification as part of the tangible connectivity plan.

Timeframe: Long-term
Landscaping Along Major Roads and Interstate ExitsInfrastructure

Tracks landscaping along major roads and interstate exits to create a unique sense of identity.

Timeframe: Short-term
Long-Term Highway Landscaping and Exit Planting Budget HeadingOperational

Tracks the long-term budget heading shown for highway landscaping and interstate exit plantings.

Projected: $160,000+ Dollars
Bike Route Signage CostOperational

Tracks cost for bike route signage.

Projected: $300 Dollars per sign
LED Lighting Fixture CostOperational

Tracks cost to update pedestrian and street lighting to LED.

Projected: $2,000 Dollars per fixture
Free WiFi Promotion DowntownInfrastructure

Tracks promotion of the availability of free WiFi downtown in the public domain.

Timeframe: Long-term

Key stakeholders

City of DouglasvilleDouglas CountyParks and Recreation DepartmentLocal businessesNorthwest Georgia Southern Off-Road Bicycle Association (SORBA)Paulding CountyPATH FoundationDouglasville Medical Center-WellStar Health SystemLive Well DouglasvilleWellStar’s “Speaking about Wellness for the Workplace”Foxhall developmentFoxhall’s developerDepartment of Community Affairs (DCA)GDOTLocal landscape expertsDowntownChattahoochee Hills Regional Path systemChattahoochee River CorridorSilver Comet TrailSR92 / Highway 92I-20 exitsSR78 and railroad ROWParksHotelsResidentsVisitorsMillennialsGeneration XPublic transportationClinton Park trails (“NWGA”)

Estimated budget

Medium-term: $300,000 total, including upgrade/update signage with a consistent, unified brand; design palette of signs for wayfinding: $30,000; develop and install signage at major geographical points of interest: $175,000; develop/install historical interpretive displays in strategic locations: $95,000, considering $2,000 to $4,000 per sign. Long-term: $160,000+ shown for highway landscaping and interstate exit plantings; design palette of landscaping and signage: $25,000; installation of landscaping and signage: $250,000 per interstate exit; bike share program and bike paths woven as a connector to the greater Douglasville experience. Implementation budget considerations: dedicated multi-use bike/pedestrian path, 12 feet wide: $600,000 per mile; buffered bike lanes at existing roads: $150,000 per mile; enhanced roadway shoulders to include 5-foot biking lane: $100,000 per mile; future expansion adjacent to SR92 connecting downtown to Silver Comet Trail: $150,000 per mile; enhancement of vehicular intersections: $3,000 per intersection; bike route signage: $300 per sign; bike parking: $500 per rack; update pedestrian and street lighting to LED: $2,000 per fixture.